Sample company (fictional) · Backflow TestingDraft generated Oct 30, 2026

Backflow test report, water system copy

Aug 20, 2026

Record

CompanySample company (fictional)
TradeBackflow Testing
TestAug 20, 2026

Property owner

NameCedar Row Properties
Emailjordan@example.com
Phone555-0111
Address137 Linden Ave, Springfield

Property

NameJordan Pike
Address137 Linden Ave, Springfield
Location44.050999999999995, -123.09100000000001

Assembly

Serial numberSE-4137
TypeRPDA (reduced pressure detector)
Location on the propertyLoading dock
Size8.25 in
ManufacturerTollin Industrial
ModelMO-4137
StateWashington
Hazard servedHazard served 2
Hazard levelNon-health or low hazard
ProtectionIn-premises (a fixture or system)
Service connectionNon-residential
Install dateAug 18, 2026
InstallationNew
Serial number of the assembly it replacedRE-4137
Water systemWater system 2
Water system IDWater system ID 2
On a fire lineNo
On a non-potable supplyNo
Detector bypass: make and modelBY-4137
Detector bypass: serial numberBY-4137
Detector bypass: size2.75 in

Test

Test dateAug 20, 2026
Reason for the testNew installation
ResultFailed
TesterJordan Pike
Licence or certificate numberTE-4137
Test kit serial numberKI-4137
StateWashington
Licence or certificate expiresSep 4, 2026
Tester phone555-0111
Test kit make and modelKI-4137
Test kit last accuracy checkFeb 19, 2026
Gauge kept forNon-potable water
Sent to the water system onAug 20, 2026
Sent throughEmail
Owner copy sent onAug 20, 2026

Installation

Make and model is an approved assembly for this usePass
Installed in the orientation its approval allowsFail
Installed as the manufacturer and the local code requirePass
RP and RPDA: an air gap below the relief valve dischargePass
Test cocks and shutoff valves present and workingPass
Reachable for testing and repairPass
Assembly type suits the hazard it protectsPass

Readings

ReadingValueResult
RP, RPDA: first check held at
Washington DOH memo to certified testers: USC Tenth Edition field test procedures (2011) (https://doh.wa.gov/sites/default/files/legacy/Documents/4200/bats.pdf), checked 2026-10-28
8 psidPass
RP, RPDA: relief valve opened at
Washington DOH memo to certified testers: USC Tenth Edition field test procedures (2011) (https://doh.wa.gov/sites/default/files/legacy/Documents/4200/bats.pdf), checked 2026-10-28
3.8 psidPass
RP, RPDA: relief valve
Washington DOH memo to certified testers: USC Tenth Edition field test procedures (2011) (https://doh.wa.gov/sites/default/files/legacy/Documents/4200/bats.pdf), checked 2026-10-28
OpenedPass
First check valveClosed tightRecorded
Second check valveClosed tightRecorded
DC, DCDA: first check held atNot takenRecorded
DC, DCDA: second check held atNot takenRecorded
PVB, SVB: air inlet opened atNot takenRecorded
PVB, SVB: air inletOpened fullyRecorded
PVB, SVB: check valve held atNot takenRecorded
Detector bypass check held atNot takenRecorded
Line pressureNot takenRecorded

Signature

The signature drawn on the phone at the job prints here.