A sample built from fictional records: every company, unit and date below is made up. Your reports carry your own records. Back to Concrete Pumps
Sample company (fictional) · Concrete PumpsDraft generated Oct 30, 2026
Boom inspection report
Aug 20, 2026
Record
| Company | Sample company (fictional) |
|---|
| Trade | Concrete Pumps |
|---|
| Inspection | Aug 20, 2026 |
|---|
Pump
| Unit ID | UN-4137 |
|---|
| Pump or boom serial | SE-4137 |
|---|
| Manufacturer | Tollin Industrial |
|---|
| Age band | 5 to 10 years |
|---|
| Working hours | 8 hours |
|---|
| Hours basis | Hours or once a year, whichever first |
|---|
| Hours between boom inspections | 500 |
|---|
| Last boom inspection | Aug 18, 2026 |
|---|
Inspection
| Scheduled | Aug 20, 2026 |
|---|
| Completed | Aug 20, 2026 |
|---|
| Status | Completed |
|---|
Boom inspection
| Boom sections, pins, bearings and welds checked for cracks and wear | Pass |
| Pedestal, outriggers, turret and main column checked | Fail |
| Delivery pipe, clamps, supports and hoses in good condition | Pass |
| Hours in service and last periodic inspection date recorded | Pass |
| Inspector is a qualified person | Pass |
Boom inspection record
| Date | Working hours at inspection | Qualified person | Findings | Repairs |
|---|
| Aug 18, 2026 | 8 hours | Qualified person 2 | | |
| Dec 31, 2025 | 2 hours | Qualified person 12 | | |
Tables
Lookup results appear on each record above.
Photos
Photos taken on the phone at the job print here, each captioned with what it shows.
Findings
| Severity | Finding | Status |
|---|
| Do not pump | Pedestal, outriggers, turret and main column checked. Failed at this inspection. | Open |
Signature
The signature drawn on the phone at the job prints here.
Next due
Annual boom inspection Boom Inspection & Repair (Schwing US), manufacturer schedule (https://www.schwing.com/service/boom-inspection-repair.html), checked 2026-10-28 | Aug 18, 2027 | Set by your contract |