Sample company (fictional) · Crane & HoistDraft generated Oct 30, 2026
Crane inspection report
Aug 20, 2026
Record
| Company | Sample company (fictional) |
|---|
| Trade | Crane & Hoist |
|---|
| Inspection | Aug 20, 2026 |
|---|
Crane
| Unit ID | UN-4137 |
|---|
| Type | Under-running bridge |
|---|
| Rated capacity | 8 tons |
|---|
| Manufacturer | Tollin Industrial |
|---|
| Serial number | SE-4137 |
|---|
| Periodic interval | 12 months |
|---|
| Frequent inspection interval | 9 days |
|---|
| Last frequent inspection | Aug 18, 2026 |
|---|
| Last monthly hook record | Aug 18, 2026 |
|---|
| Standby crane | No |
|---|
| Location in building | Loading dock |
|---|
Inspection
| Scheduled | Aug 20, 2026 |
|---|
| Completed | Aug 20, 2026 |
|---|
| Status | Completed |
|---|
Periodic
| Hooks: cracks, deformation, throat opening, twist | Pass |
| Wire rope: broken wires, kinks, corrosion, reduced diameter | Fail |
| Hoist and trolley brakes hold | Pass |
| Upper limit switch trips | Pass |
| Load chain or sheaves: wear and damage | Pass |
| Pendant controls and markings legible | Pass |
| Rated capacity marked and legible | Pass |
| Structure, drums and sheaves examined | Pass |
Frequent
| Operating mechanisms: visual check for adjustment and wear | Pass |
| Hooks: visual check for damage | Pass |
| Hydraulic and air lines: leaks and damage | Pass |
Return to service
| Idle period recorded; complete inspection done before use if idle over 6 months | Pass |
| Standby crane: last inspection within the half-year | Pass |
Readings
| Reading | Value | Result |
|---|
Hook throat opening over nominal 29 CFR 1910.179 hook defect limits (eCFR) (https://www.ecfr.gov/api/renderer/v1/content/enhanced/current/title-29?part=1910§ion=1910.179), checked 2026-10-28 | 9 % | Pass |
Hook twist from plane of unbent hook 29 CFR 1910.179 hook defect limits (eCFR) (https://www.ecfr.gov/api/renderer/v1/content/enhanced/current/title-29?part=1910§ion=1910.179), checked 2026-10-28 | 6 degrees | Pass |
Photos
Photos taken on the phone at the job print here, each captioned with what it shows.
Findings
| Severity | Finding | Status |
|---|
| Remove from service | Wire rope: broken wires, kinks, corrosion, reduced diameter. Failed at this inspection. | Open |
Signature
The signature drawn on the phone at the job prints here.
Next due
Frequent inspection 29 CFR 1910.179 frequent inspection (eCFR) (https://www.ecfr.gov/api/renderer/v1/content/enhanced/current/title-29?part=1910§ion=1910.179), checked 2026-10-28 | Aug 27, 2026 | Set by your contract |
Monthly hook and chain inspection record 29 CFR 1910.179 hooks, monthly record (eCFR) (https://www.ecfr.gov/api/renderer/v1/content/enhanced/current/title-29?part=1910§ion=1910.179), checked 2026-10-28 | Sep 18, 2026 | Set by rule |
Periodic inspection 29 CFR 1910.179 periodic inspection (Cornell LII) (https://www.law.cornell.edu/cfr/text/29/1910.179), checked 2026-10-28 | Sep 25, 2027 | Set by rule |