A sample built from fictional records: every company, unit and date below is made up. Your reports carry your own records. Back to Electrical Testing

Sample company (fictional) · Electrical TestingDraft generated Oct 30, 2026

Electrical maintenance test report

Aug 20, 2026

Record

CompanySample company (fictional)
TradeElectrical Testing
Test visitAug 20, 2026

Equipment

Equipment tagTA-4137
TypeSwitchboard
ManufacturerTollin Industrial
Serial numberSE-4137
LocationLoading dock
Assigned conditionCondition 2
Reason for conditionReason for condition 2
Maintenance interval9 months
Last testedAug 18, 2026
Condition label appliedNo

Test visit

ScheduledAug 20, 2026
CompletedAug 20, 2026
StatusCompleted

Maintenance

Condition assigned from physical state, criticality and environmentPass
Interval taken from the table for this equipment typeFail
Visual and mechanical inspection, cleaning, torque and thermal scan as this equipment calls forPass
Electrical tests run and results compared with the last cyclePass
Equipment that missed two cycles or shows deterioration flagged for a worse conditionPass
Condition label on the equipment updated after the workPass

Readings

ReadingValueResult
Insulation resistanceNot takenRecorded
Contact resistanceNot takenRecorded
Thermal scan rise over ambientNot takenRecorded

Photos

Photos taken on the phone at the job print here, each captioned with what it shows.

Findings

SeverityFindingStatus
De-energize and tagInterval taken from the table for this equipment type. Failed at this test visit.Open

Signature

The signature drawn on the phone at the job prints here.

Next due

Next maintenance and testMay 18, 2027Set by your contract