A sample built from fictional records: every company, unit and date below is made up. Your reports carry your own records. Back to Lightning Protection

Sample company (fictional) · Lightning ProtectionDraft generated Oct 30, 2026

Lightning protection inspection report

Aug 20, 2026

Record

CompanySample company (fictional)
TradeLightning Protection
InspectionAug 20, 2026

System

Structure IDStructure ID 2
Address137 Linden Ave, Springfield
InstallerInstaller 2
Certificate numberCE-4137
Installed onAug 18, 2026
Last yearly visualAug 18, 2026
In-depth inspection interval3 years
Last in-depth inspectionAug 18, 2026

Inspection

ScheduledAug 20, 2026
CompletedAug 20, 2026
StatusCompleted

Inspection

Air terminals in place, upright and undamagedPass
Conductors continuous, fastened and free of corrosionFail
Bonds to roof metal, antennas and pipes intactPass
Ground rods or ring reachable and not erodedPass
Surge protective device indicators show healthyPass
Roof or structure changes since last visit that touch the system notedPass
After any known strike: whole system walkedPass

Readings

ReadingValueResult
Ground resistanceNot takenRecorded

Photos

Photos taken on the phone at the job print here, each captioned with what it shows.

Findings

SeverityFindingStatus
UnsafeConductors continuous, fastened and free of corrosion. Failed at this inspection.Open

Signature

The signature drawn on the phone at the job prints here.

Next due

Yearly visual inspection
LPI Tech Bulletin: Lightning Protection System Maintenance and Industry Requirements (https://lightning.org/?p=13376), checked 2026-10-28
Aug 18, 2027Set by rule
In-depth inspection
LPI Tech Bulletin: Lightning Protection System Maintenance and Industry Requirements (https://lightning.org/?p=13376), checked 2026-10-28
Aug 18, 2029Set by rule