A sample built from fictional records: every company, unit and date below is made up. Your reports carry your own records. Back to Motor Repair Shops
Sample company (fictional) · Motor Repair ShopsDraft generated Oct 30, 2026
Motor test report
JO-4100
Record
| Company | Sample company (fictional) |
|---|
| Trade | Motor Repair Shops |
|---|
| Repair job | JO-4100 |
|---|
Customer
| Name | Northgate Fabrication |
|---|
| Email | avery@example.com |
|---|
| Phone | 555-0110 |
|---|
| Address | 120 Foundry Rd, Springfield |
|---|
Motor
| Shop motor number | SH-4100 |
|---|
| Customer tag | CU-4100 |
|---|
| Manufacturer | Brackwater Equipment |
|---|
| Model or catalog number | MO-4100 |
|---|
| Serial number | SE-4100 |
|---|
| Type | AC induction |
|---|
| Horsepower | 1 hp |
|---|
| Kilowatts | 1 kW |
|---|
| Voltage | Voltage 1 |
|---|
| Full-load amps | 1 A |
|---|
| Rated speed | 1 rpm |
|---|
| Frame | Frame 1 |
|---|
| Phase | Three-phase |
|---|
| Frequency | 60 Hz |
|---|
| Enclosure | Open drip-proof |
|---|
| Insulation class | A |
|---|
| Service factor | 1 |
|---|
| Retest every | 2 months |
|---|
| Last tested on | Oct 10, 2026 |
|---|
Repair job
| Job number | JO-4100 |
|---|
| Received on | Sep 30, 2026 |
|---|
| Customer PO | Customer PO 1 |
|---|
| Stage | Received |
|---|
| Why it came in | Why it came in 1 |
|---|
| Failure found | Winding failure |
|---|
| Work done | Clean and bake |
|---|
| Slots | 2 |
|---|
| Poles | 3 |
|---|
| Coil pitch | Coil pitch 1 |
|---|
| Turns per coil | 2 |
|---|
| Wire size and strands in hand | Wire size and strands in hand 1 |
|---|
| Connection | Connection 1 |
|---|
| Bearings | Bearings 1 |
|---|
| Quote | $1 |
|---|
| Customer approved on | Sep 30, 2026 |
|---|
| Final test passed on | Sep 30, 2026 |
|---|
| Shipped on | Sep 30, 2026 |
|---|
| Shop warranty | 1 month |
|---|
Readings
| Reading | Value | Result |
|---|
| Insulation test voltage | Not taken | Recorded |
| Insulation resistance as found (megger) | Not taken | Recorded |
| Insulation resistance at final test (megger) | Not taken | Recorded |
| Polarization index | Not taken | Recorded |
| Winding resistance T1-T2 | Not taken | Recorded |
| Winding resistance T2-T3 | Not taken | Recorded |
| Winding resistance T3-T1 | Not taken | Recorded |
| Surge comparison | Waveforms match | Recorded |
| Hipot | Held | Recorded |
| No-load amps, average | Not taken | Recorded |
| Vibration, highest reading | Not taken | Recorded |
Final
| Rotation checked against what the plant needs | Pass |
| Shaft runout checked | Pass |
| Leads labeled | Pass |
| Repair tag fixed to the frame | Pass |
| Painted, shaft protected and openings covered for shipping | Pass |
Signature
The signature drawn on the phone at the job prints here.