A sample built from fictional records: every company, unit and date below is made up. Your reports carry your own records. Back to Rig Repack Log

Sample company (fictional) · Rig Repack LogDraft generated Oct 30, 2026

Reserve repack record

Sep 30, 2026

Record

CompanySample company (fictional)
TradeRig Repack Log
Rigger's log entrySep 30, 2026

Rig

Rig numberRig number 1
UseStudent
OwnerNorthgate Fabrication
Harness and container make and modelHarness and container make and model 1
Container serial numberCO-4100
Reserve make and typeReserve make and type 1
Reserve serial numberRE-4100
Reserve canopy, shroud lines and harnessSynthetic only (nylon, rayon or similar)
Main make and modelMain make and model 1
Main serial numberMA-4100
AAD make and modelAAD make and model 1
AAD serial numberAA-4100
AAD service dueMar 29, 2027
AAD end of lifeMay 28, 2027

Rigger's log entry

DateSep 30, 2026
Work doneReserve repack
PlacePlace 1
RiggerAvery Lund
Rigger's certificate numberCE-4100
AAD dates checked against the maker's instructionsYes

Reserve repack

Canopy thoroughly dried and aired before packingPass
Packed to the procedure of the reserve's makerPass
AAD service and end-of-life dates read against the maker's instructionsPass
Pack card shows the date, place and any defects, signed with name and certificate numberPass
Pack sealed with the rigger's sealPass

Signature

The signature drawn on the phone at the job prints here.

Next due

Reserve repack
14 CFR 105.43(b) reserve parachute packing (eCFR) (https://www.ecfr.gov/api/renderer/v1/content/enhanced/current/title-14?part=105&section=105.43), checked 2026-10-29
Mar 29, 2027Set by rule