Rigging inspection report
Aug 21, 2026
Record
| Company | Sample company (fictional) |
|---|---|
| Trade | Stage Rigging |
| Inspection | Aug 21, 2026 |
Rigging system
| System ID | System ID 2 |
|---|---|
| Type | Motorized hoist |
| Space | Loading dock |
| Level Two interval | 5 years |
| Last Level Two inspection | Aug 19, 2026 |
| Facility logbook location | Facility logbook location 2 |
Inspection
| Scheduled | Aug 21, 2026 |
|---|---|
| Completed | Aug 21, 2026 |
| Status | Completed |
Level one
| Walk of all accessible rigging: hoists, line sets, attachments, fittings | Pass |
| Capacity and warning signage present and legible | Fail |
| Facility logbook, crew training records and curtain flame-retardancy papers on hand | Pass |
| Written report with condition and recommended repairs | Pass |
| Level Two scheduled or recorded | Pass |
Photos
Photos taken on the phone at the job print here, each captioned with what it shows.
Findings
| Severity | Finding | Status |
|---|---|---|
| Remove from service | Capacity and warning signage present and legible. Failed at this inspection. | Open |
Signature
The signature drawn on the phone at the job prints here.
Next due
| Level One inspection ESTA BSR E1.47 public draft, Entertainment Rigging System Inspections (draft) (https://tsp.esta.org/tsp/documents/docs/BSR%20E1.47_2014-2003r9b.pdf), checked 2026-10-28 | Aug 21, 2027 | Set by rule |
| Level Two inspection ESTA BSR E1.47 public draft, Entertainment Rigging System Inspections (draft) (https://tsp.esta.org/tsp/documents/docs/BSR%20E1.47_2014-2003r9b.pdf), checked 2026-10-28 | Aug 19, 2031 | Set by rule |
Limitations
This report shows the records on file on the day it was issued.